{"id":7592,"date":"2019-02-13T23:08:12","date_gmt":"2019-02-13T23:08:12","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6827"},"modified":"2022-03-31T05:53:11","modified_gmt":"2022-03-31T05:53:11","slug":"transcontinental-nadev-printing-facility","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/transcontinental-nadev-printing-facility\/","title":{"rendered":"Transcontinental NADEV Printing Facility"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;3.22&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;3.27.4&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]This ground-up Design\/Build project located in Fremont, CA consists of a 338,000 SF printing plant facility for Canadian based company Transcontinental.&nbsp; The electrical scope of work includes a 21 kV power distribution system with (4) 3000 Amp substations.&nbsp; The emergency power distribution system includes (3) 1250 kW generators with provisions for a future 1250 kW.&nbsp; The generators are paralleled onto a 6000 Amp emergency power distribution switchboard which serves to keep the plant running under abnormal conditions.&nbsp; The plant has enough capacity for five printing presses.&nbsp; The facility incorporates state of the art lighting technology and is the first industrial facility in the State of California to achieve LEED Silver Certification.<\/p>\n<p>The&nbsp;$80-million&nbsp;dollar printing facility was completed after 15 months of construction to&nbsp;house the printing needs of the Bay Area&#8217;s primary daily newspaper, the San Francisco Chronicle.&nbsp; This first-of-its-kind facility in the U.S. consists of a 97,275-sq-ft press hall and a 238,375-sq-ft mail room, as well as office space, high bay storage and mechanical equipment rooms.<br \/>\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This ground-up Design\/Build project located in Fremont, CA consists of a 338,000 SF printing plant facility for Canadian based company Transcontinental.&nbsp; The electrical scope of work includes a 21 kV power distribution system with (4) 3000 Amp substations.&nbsp; The emergency power distribution system includes (3) 1250 kW generators with provisions for a future 1250 kW.&nbsp; [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6828,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"This ground-up Design\/Build project located in Fremont, CA consists of a 338,000 SF printing plant facility for Canadian based company Transcontinental.&nbsp; The electrical scope of work includes a 21 kV power distribution system with (4) 3000 Amp substations.&nbsp; The emergency power distribution system includes (3) 1250 kW generators with provisions for a future 1250 kW.&nbsp; The generators are paralleled onto a 6000 Amp emergency power distribution switchboard which serves to keep the plant running under abnormal conditions.&nbsp; The plant has enough capacity for five printing presses.&nbsp; The facility incorporates state of the art lighting technology and is the first industrial facility in the State of California to achieve LEED Silver Certification.\n\nThe&nbsp;$80-million&nbsp;dollar printing facility was completed after 15 months of construction to&nbsp;house the printing needs of the Bay Area's primary daily newspaper, the San Francisco Chronicle.&nbsp; This first-of-its-kind facility in the U.S. consists of a 97,275-sq-ft press hall and a 238,375-sq-ft mail room, as well as office space, high bay storage and mechanical equipment rooms.\n","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[400],"owners":[],"gcs":[399],"project_category":[234],"project_tag":[],"class_list":["post-7592","project","type-project","status-publish","has-post-thumbnail","hentry","locations-fremont-ca","gcs-mccarthy-construction","project_category-industrial"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7592"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7592\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6828"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7592"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7592"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7592"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7592"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7592"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}