{"id":7582,"date":"2019-02-12T20:34:12","date_gmt":"2019-02-12T20:34:12","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6779"},"modified":"2022-03-31T06:05:31","modified_gmt":"2022-03-31T06:05:31","slug":"eastside-data-center-2","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/eastside-data-center-2\/","title":{"rendered":"Eastside Data Center"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;]<br \/>\n\t\t\t[et_pb_row admin_label=&#8221;row&#8221;]<br \/>\n\t\t\t\t[et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221;]PRIME was awarded the project with Sellen Construction. On the first &nbsp;floor of the 80,000sf building, Prime&#8217;s team completed the data center build out housing 18 pods for servers. The second floor included new office space for tenants, a Radio Room and a Radio Frequency Booth for testing future cellular devices. Lastly, the scope included the addition of a third floor for mechanical interstitial space. Constructing the third floor presented a challenge for the team as it was built in the middle of winter while project crews were starting scope on the first and second floors. Although a challenge, PRIME&#8217;s team successfully completed the scope.[\/et_pb_text][\/et_pb_column]<br \/>\n\t\t\t[\/et_pb_row]<br \/>\n\t\t[\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PRIME was awarded the project with Sellen Construction. On the first &nbsp;floor of the 80,000sf building, Prime&#8217;s team completed the data center build out housing 18 pods for servers. The second floor included new office space for tenants, a Radio Room and a Radio Frequency Booth for testing future cellular devices. Lastly, the scope included [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6601,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"PRIME was awarded the project with Sellen Construction. On the first &nbsp;floor of the 80,000sf building, Prime's team completed the data center build out housing 18 pods for servers. The second floor included new office space for tenants, a Radio Room and a Radio Frequency Booth for testing future cellular devices. Lastly, the scope included the addition of a third floor for mechanical interstitial space. Constructing the third floor presented a challenge for the team as it was built in the middle of winter while project crews were starting scope on the first and second floors. Although a challenge, PRIME's team successfully completed the scope.","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[352],"owners":[],"gcs":[385],"project_category":[238],"project_tag":[],"class_list":["post-7582","project","type-project","status-publish","has-post-thumbnail","hentry","locations-redmond-wa","gcs-sellen-construction","project_category-mission-critical-data-centers"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7582"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7582\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6601"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7582"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7582"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7582"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7582"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7582"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}