{"id":7579,"date":"2019-02-12T20:01:40","date_gmt":"2019-02-12T20:01:40","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6775"},"modified":"2022-03-31T06:35:22","modified_gmt":"2022-03-31T06:35:22","slug":"909-5th-ave-condos","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/909-5th-ave-condos\/","title":{"rendered":"909 5th AVE Condos"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;3.22&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;3.27.4&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]Prime Electric was selected by Turner Construction as the Design Build Electrical Contractor for the new 25 story 909 5th Avenue Condominium Tower in downtown Seattle. The LEED Gold high-rise includes 123 high end condominiums and 3 world class penthouse suites. Amenity areas include a ground level plaza, an upper level commons room with terrace, a full health club and a library\/media facility. Penthouse units feature a &#8220;Whole House System&#8221; This system involves full home automation including audio\/visual, lighting, motorized window shades and fire place control from any room. The building includes state of the art high rise life safety systems. These systems are backed up by a 500KW diesel powered emergency generator.[\/et_pb_text][wpmf_gallery_divi _builder_version=&#8221;4.14.9&#8243; _module_preset=&#8221;default&#8221; theme_builder_area=&#8221;post_content&#8221; items=&#8221;6759,6758&#8243; columns=&#8221;2&#8243; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;][\/wpmf_gallery_divi][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prime Electric was selected by Turner Construction as the Design Build Electrical Contractor for the new 25 story 909 5th Avenue Condominium Tower in downtown Seattle. The LEED Gold high-rise includes 123 high end condominiums and 3 world class penthouse suites. Amenity areas include a ground level plaza, an upper level commons room with terrace, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6758,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"Prime Electric was selected by Turner Construction as the Design Build Electrical Contractor for the new 25 story 909 5th Avenue Condominium Tower in downtown Seattle. The LEED Gold high-rise includes 123 high end condominiums and 3 world class penthouse suites. Amenity areas include a ground level plaza, an upper level commons room with terrace, a full health club and a library\/media facility. Penthouse units feature a \"Whole House System\" This system involves full home automation including audio\/visual, lighting, motorized window shades and fire place control from any room. The building includes state of the art high rise life safety systems. These systems are backed up by a 500KW diesel powered emergency generator.","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[343],"owners":[],"gcs":[371],"project_category":[232],"project_tag":[],"class_list":["post-7579","project","type-project","status-publish","has-post-thumbnail","hentry","locations-seattle-wa","gcs-turner-construction","project_category-high-rise-mixed-use"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7579"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7579\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6758"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7579"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7579"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7579"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7579"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7579"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}