{"id":7572,"date":"2019-02-10T17:30:16","date_gmt":"2019-02-10T17:30:16","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6718"},"modified":"2022-03-31T06:47:23","modified_gmt":"2022-03-31T06:47:23","slug":"stanford-linear-accelerator-center","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/stanford-linear-accelerator-center\/","title":{"rendered":"Stanford Linear Accelerator Center"},"content":{"rendered":"<p>Prime has completed multiple projects for the&nbsp;Stanford Linear Accelerator Center (SLAC).<\/p>\n<p><strong>SLAC LCLS-II B950 NEH RECONFIGURATION<\/strong><br \/>\nThe work consists of construction and reconfiguration of Hutches 1.1 and 1.2 in the Sub-Basement. The LCLS-II NEH Recon-figuration Project in the basement level includes, but is not limited to construction of a Laser Hall, Laser Lab, Hutches 2.1 and 2.2, Timing Lab and RIXS Control Room, demolition and removal of existing utilities and installation of new HVAC and, electri-cal conduits, cable trays, and cabling, mechanical piping.<\/p>\n<p><strong>SLAC T3A &amp; T3B<\/strong><br \/>\nRemoval, turn-over, and replacement of (2) 2,500 kVA medium voltage transformers in a substation. Performed LOTO, Medium Voltage terminations, 480V terminations, cable testing, grounding, rigging, and metal siding removal\/replacement.<\/p>\n<p><strong>SLAC B041 &#8211; DOE SUPPORT BUILDING+ B052 CONTROL ROOM&nbsp;<\/strong><br \/>\nThe 47,000 square foot build-out comprised of state of the art equipment to support the accelerator and its support staff. Addi-tional work involved linking the new ACR to the Main Control Center at Building 005 via a new duct bank.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prime has completed multiple projects for the&nbsp;Stanford Linear Accelerator Center (SLAC). SLAC LCLS-II B950 NEH RECONFIGURATION The work consists of construction and reconfiguration of Hutches 1.1 and 1.2 in the Sub-Basement. The LCLS-II NEH Recon-figuration Project in the basement level includes, but is not limited to construction of a Laser Hall, Laser Lab, Hutches 2.1 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6719,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[372],"owners":[],"gcs":[403],"project_category":[233],"project_tag":[],"class_list":["post-7572","project","type-project","status-publish","has-post-thumbnail","hentry","locations-menlo-park-ca","gcs-various","project_category-technologies"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7572"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7572\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6719"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7572"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7572"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7572"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7572"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7572"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}