{"id":7551,"date":"2019-02-05T18:55:51","date_gmt":"2019-02-05T18:55:51","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6529"},"modified":"2022-03-31T05:27:53","modified_gmt":"2022-03-31T05:27:53","slug":"linkedin","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/linkedin\/","title":{"rendered":"LinkedIn"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;3.22&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;3.27.4&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]This design build project of 950 &amp; 1000 Maude consisted of the renovation of 2 buildings located on Maude Avenue in Sunnyvale, CA.<\/p>\n<p>950 Maude is a 125,000-sq. ft., 4-story with office renovations on floors 2-4 and full server kitchen &amp; caf\u00e9 on the 1st floor with Enlighted lighting controls. Concurrent with construction was a service upgrade to facilitate the building added load requirements as well as EV Charging stations throughout the site and within the existing parking garage.<\/p>\n<p>1000 Maude is a 125,000-sq. ft. 4-story with office renovations on floors 1-4 and with Enlighted lighting controls and Facility Ops required infrastructure. The facility was made up of mainly office space with a 7,500-sq ft. indoor\/outdoor fitness area with showers and lockers on the 1st floor. Concurrent with construction was a service upgrade to facilitate the building added load requirements as well as EV Charging stations throughout the site and within the existing parking garage.<\/p>\n<p>PRIME coordinated major power upgrades to existing PG&amp;E infrastructure to accommodate the upgrade of the facilities to meet customer standards and power needs. Both buildings required extensive BIM modeling for installation of all overhead systems for the open architecture requirements as well as sound masking material requirements.[\/et_pb_text][wpmf_gallery_divi _builder_version=&#8221;4.14.9&#8243; _module_preset=&#8221;default&#8221; theme_builder_area=&#8221;post_content&#8221; items=&#8221;6539,6538,6537,6536,6535,6534,6533,6532,6531,6530&#8243; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;][\/wpmf_gallery_divi][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This design build project of 950 &amp; 1000 Maude consisted of the renovation of 2 buildings located on Maude Avenue in Sunnyvale, CA. 950 Maude is a 125,000-sq. ft., 4-story with office renovations on floors 2-4 and full server kitchen &amp; caf\u00e9 on the 1st floor with Enlighted lighting controls. Concurrent with construction was a [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6535,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"This design build project of 950 &amp; 1000 Maude consisted of the renovation of 2 buildings located on Maude Avenue in Sunnyvale, CA.\n\n950 Maude is a 125,000-sq. ft., 4-story with office renovations on floors 2-4 and full server kitchen &amp; caf\u00e9 on the 1st floor with Enlighted lighting controls. Concurrent with construction was a service upgrade to facilitate the building added load requirements as well as EV Charging stations throughout the site and within the existing parking garage.\n\n1000 Maude is a 125,000-sq. ft. 4-story with office renovations on floors 1-4 and with Enlighted lighting controls and Facility Ops required infrastructure. The facility was made up of mainly office space with a 7,500-sq ft. indoor\/outdoor fitness area with showers and lockers on the 1st floor. Concurrent with construction was a service upgrade to facilitate the building added load requirements as well as EV Charging stations throughout the site and within the existing parking garage.\n\nPRIME coordinated major power upgrades to existing PG&amp;E infrastructure to accommodate the upgrade of the facilities to meet customer standards and power needs. Both buildings required extensive BIM modeling for installation of all overhead systems for the open architecture requirements as well as sound masking material requirements.","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[384],"owners":[],"gcs":[363],"project_category":[231,230],"project_tag":[],"class_list":["post-7551","project","type-project","status-publish","has-post-thumbnail","hentry","locations-sunnyvale-ca","gcs-xl-construction","project_category-class-a-office-tis","project_category-featured-projects"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7551"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7551\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6535"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7551"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7551"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7551"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7551"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7551"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}