{"id":7548,"date":"2019-02-05T18:42:20","date_gmt":"2019-02-05T18:42:20","guid":{"rendered":"http:\/\/primeelectric.wpengine.com\/?post_type=project&#038;p=6515"},"modified":"2022-03-31T05:32:11","modified_gmt":"2022-03-31T05:32:11","slug":"tableau-data-1","status":"publish","type":"project","link":"https:\/\/www.primee.com\/project\/tableau-data-1\/","title":{"rendered":"Tableau Data 1"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;3.22&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;3.27.4&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]<\/p>\n<p class=\"BasicParagraph\">Tableau Data 1 is a&nbsp;five floor, High End Technology tenant&nbsp;T\/I build out , over an occupied 1st floor Retail space, with Post Tension floors. This Design\/ Build TI includes an aggressive schedule along with substantial core and shell upgrades. Prime performed all electrical work along with systems coordination and full Revit modeling.(With On-Site team &#8211;Architect\/GC and MEP) BIM Modeling and super- plot&nbsp; coordination with all trades for a seamless installation. Prime successfully completed commissioning and training for the electrical system, Lighting control&nbsp; system, Fire Alarm and mechanical equipment.&nbsp; This project also included custom lighting (award winning) and lighting control throughout, including conference rooms, hallways, and open work areas. Build-out of a large Cafeteria&nbsp; lounge, individual pantries per floor and full kitchen with cook-tops, range appliances. Coordination of raceways for Security,&nbsp; Audio Visual and Data rough in, including Build out of MDF and IDF rooms. Complete electric room build out per floor, including, distribution, branch and&nbsp;bus risers. Furnished and install individual floor Power Inverters for emergency back up lighting.<\/p>\n<p>[\/et_pb_text][wpmf_gallery_divi _builder_version=&#8221;4.14.9&#8243; _module_preset=&#8221;default&#8221; theme_builder_area=&#8221;post_content&#8221; items=&#8221;6520,6519,6518,6517,6516&#8243; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;][\/wpmf_gallery_divi][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tableau Data 1 is a&nbsp;five floor, High End Technology tenant&nbsp;T\/I build out , over an occupied 1st floor Retail space, with Post Tension floors. This Design\/ Build TI includes an aggressive schedule along with substantial core and shell upgrades. Prime performed all electrical work along with systems coordination and full Revit modeling.(With On-Site team &#8211;Architect\/GC [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6516,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p class=\"BasicParagraph\">Tableau Data 1 is a&nbsp;five floor, High End Technology tenant&nbsp;T\/I build out , over an occupied 1st floor Retail space, with Post Tension floors. This Design\/ Build TI includes an aggressive schedule along with substantial core and shell upgrades. Prime performed all electrical work along with systems coordination and full Revit modeling.(With On-Site team --Architect\/GC and MEP) BIM Modeling and super- plot&nbsp; coordination with all trades for a seamless installation. Prime successfully completed commissioning and training for the electrical system, Lighting control&nbsp; system, Fire Alarm and mechanical equipment.&nbsp; This project also included custom lighting (award winning) and lighting control throughout, including conference rooms, hallways, and open work areas. Build-out of a large Cafeteria&nbsp; lounge, individual pantries per floor and full kitchen with cook-tops, range appliances. Coordination of raceways for Security,&nbsp; Audio Visual and Data rough in, including Build out of MDF and IDF rooms. Complete electric room build out per floor, including, distribution, branch and&nbsp;bus risers. Furnished and install individual floor Power Inverters for emergency back up lighting.<\/p>","_et_gb_content_width":"","wds_primary_project_category":0,"footnotes":""},"locations":[343],"owners":[],"gcs":[346],"project_category":[231],"project_tag":[],"class_list":["post-7548","project","type-project","status-publish","has-post-thumbnail","hentry","locations-seattle-wa","gcs-lease-crutcher-lewis","project_category-class-a-office-tis"],"_links":{"self":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/comments?post=7548"}],"version-history":[{"count":0,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project\/7548\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media\/6516"}],"wp:attachment":[{"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/media?parent=7548"}],"wp:term":[{"taxonomy":"locations","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/locations?post=7548"},{"taxonomy":"owners","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/owners?post=7548"},{"taxonomy":"gcs","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/gcs?post=7548"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_category?post=7548"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.primee.com\/wp-json\/wp\/v2\/project_tag?post=7548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}